Improve Decoking Operations

Improve Decoking Operations

Remove coke safely and quickly, and prevent overheating coils

Decrease Downtime with Improved Decoke Air Measurement

Operators desire to decoke their furnace as quickly as possible to reduce downtime and lower maintenance costs. This requires air and steam to be mixed in a specific ratio and rate to enable efficient decoking and minimize overheating the coils. Traditional DP flow, and mechanical metering technology  prevent efficient decoking and increase maintenance costs due to plugging from coke fines in the process streams. Upgrading to Coriolis or vortex technology provides a maintenance-free option, improving reliability and efficiency.

En savoir plus
Cliquez pour continuer la lecture Decrease Downtime with Improved Decoke Air Measurement
Improve Decoking Operations

Related Product Applications

Steam Cracking Furnace Dilution Control

Reduce coking rate

Ethylene Custody Transfer

Reduce Lost and Unaccounted for

Reduce Steam Losses

Reduce emissions and energy consumption

Improve Cooling Water Quality

Control Corrosion

Plant Air and Gas Distribution

Reduce gas consumption and energy cost

Tank Dewatering

Reduce environmental fines, product loss and tank corrosion

Improve Plant Mass and Energy Balance

Reduce losses, improve efficiency, and minimize energy consumption

Activez JavaScript pour utiliser ce site Web.